American Institute of Aeronautics and Astronautics Cessna/ Raytheon Design- Build-Fly Competition Team

Faculty Mentor Name

Jacob Zwick and David Lanning

Format Preference

Poster Presentation and Demonstration

Abstract

The mission of the ERAU AIAA D-B-F team for the 2015-2016 academic year is to apply engineering and problem-solving skills to design and fabricate an aircraft with outstanding flight performance qualities that surpass all mission requirements effectively, efficiently, and consistently. Members will gain experience pertinent to their respected fields by working in teams, voicing their ideas, and competing against collegiate engineering teams from around the globe. The design phase of the project will begin immediately at the release of the mission requirements, followed by the construction of the first prototypes by the end of the fall semester, and completion of competition-capable aircraft by March 2016.

Poster Presentation and Demonstration

EAGLE PRIZE AWARD

Location

AC1-ATRIUM

Start Date

4-8-2016 1:00 PM

End Date

4-8-2016 3:00 PM

Share

COinS
 
Apr 8th, 1:00 PM Apr 8th, 3:00 PM

American Institute of Aeronautics and Astronautics Cessna/ Raytheon Design- Build-Fly Competition Team

AC1-ATRIUM

The mission of the ERAU AIAA D-B-F team for the 2015-2016 academic year is to apply engineering and problem-solving skills to design and fabricate an aircraft with outstanding flight performance qualities that surpass all mission requirements effectively, efficiently, and consistently. Members will gain experience pertinent to their respected fields by working in teams, voicing their ideas, and competing against collegiate engineering teams from around the globe. The design phase of the project will begin immediately at the release of the mission requirements, followed by the construction of the first prototypes by the end of the fall semester, and completion of competition-capable aircraft by March 2016.

Poster Presentation and Demonstration

EAGLE PRIZE AWARD