Location
Cocoa Beach, FL
Start Date
7-3-1966 8:00 AM
Description
This paper will identify the test philosophies, describe the S-1C instrumentation systems and associated GSE, and define the test and checkout methods used at KSC, for S-1C test and checkout operations.
COinS
Mar 7th, 8:00 AM
S-1C Stage Instrumentation Systems Checkout at KSC
Cocoa Beach, FL
This paper will identify the test philosophies, describe the S-1C instrumentation systems and associated GSE, and define the test and checkout methods used at KSC, for S-1C test and checkout operations.