Start Date

4-1979 8:00 AM

Description

At the beginning of 1979, the SPACELAB program has attained one of its major objectives: the Engineering Model (EM) is fully assembled according to planned test configurations and is operating and demonstrating its functional capability at ERNOs Spacelab Integration Facility.

Delivery of Flight Unit Hardware to the ERNO Integration Center has started and preparations for FU Integration and Test activities are set up accordingly.

This paper describes the current SPACELAB development status in more detail by addressing the following areas: Implementation of Requirements; Model Philosophy; Spacelab Systems/ Subsystems; Industrial Organization; Qualification Program; and Status of Integration & Test activities.

Comments

No other information or file available for this session.

Share

COinS
 
Apr 1st, 8:00 AM

Spacelab Development Status

At the beginning of 1979, the SPACELAB program has attained one of its major objectives: the Engineering Model (EM) is fully assembled according to planned test configurations and is operating and demonstrating its functional capability at ERNOs Spacelab Integration Facility.

Delivery of Flight Unit Hardware to the ERNO Integration Center has started and preparations for FU Integration and Test activities are set up accordingly.

This paper describes the current SPACELAB development status in more detail by addressing the following areas: Implementation of Requirements; Model Philosophy; Spacelab Systems/ Subsystems; Industrial Organization; Qualification Program; and Status of Integration & Test activities.

 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.