Start Date

4-1979 8:00 AM

Description

The Spacelab, which is designed and built principally by the European Space Agency and its contractor, ERNO, with certain elements provided by the McDonnell Douglas Technical Services Company, under contract to NASA, will be operated by NASA as a key element of the Space Transportation System. Like the Shuttle, the "operational base" for the Spacelab will be the Kennedy Space Center in Florida.

The Spacelab modular design and'its operational interrelationship among the Shuttle, the Spacelab Payload and the ground facilities dictate a particular approach to the ground turnaround in order to achieve the projected mission model. Spacelab facilities and GSE are being prepared at KSC and intense planning is under way to develop a disciplined, systematic operational scheme which is key to the quick turnaround required of all STS elements.

A certain portion of the Spacelab ground operational cycle will be almost totally dependent upon the Shuttle turnaround functions, such as the period after Spacelab installation into the Orbiter for pre-launch processing, and the period immediately after landing, prior to removal of the Spacelab. During these times, the Spacelab is operationally an extension of the Orbiter systems and is functionally under Orbiter control.

Comments

No other information or file available for this session.

Share

COinS
 
Apr 1st, 8:00 AM

Spacelab Ground Operations

The Spacelab, which is designed and built principally by the European Space Agency and its contractor, ERNO, with certain elements provided by the McDonnell Douglas Technical Services Company, under contract to NASA, will be operated by NASA as a key element of the Space Transportation System. Like the Shuttle, the "operational base" for the Spacelab will be the Kennedy Space Center in Florida.

The Spacelab modular design and'its operational interrelationship among the Shuttle, the Spacelab Payload and the ground facilities dictate a particular approach to the ground turnaround in order to achieve the projected mission model. Spacelab facilities and GSE are being prepared at KSC and intense planning is under way to develop a disciplined, systematic operational scheme which is key to the quick turnaround required of all STS elements.

A certain portion of the Spacelab ground operational cycle will be almost totally dependent upon the Shuttle turnaround functions, such as the period after Spacelab installation into the Orbiter for pre-launch processing, and the period immediately after landing, prior to removal of the Spacelab. During these times, the Spacelab is operationally an extension of the Orbiter systems and is functionally under Orbiter control.

 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.