Subscribe to RSS Feed (Opens in New Window)

Sessions
1983
Friday, April 1st
8:00 AM

Cargo Integration

George R. Faenza, Director, Kennedy Space Division, McDonnell Douglas Technical Services Company, John F. Kennedy Space Center, Florida

8:00 AM

8:00 AM

Design of the Space Telescope for Deployment and Servicing by the Space Shuttle

William F. Wright, Vice President, NASA Programs, Space Systems Division, Lockheed Missiles & Space Company, Inc., Sunnyvale, California
Marne L. Mercer, STS Interface Manager, Space Telescope Program, Lockheed Missiles & Space Company, Inc., Sunnyvale, California

8:00 AM

8:00 AM

Future Scientific Missions for STS

Carmine E. De Sanctis, Advanced Systems Office, Program Development, George C. Marshall Space Flight Center, National Aeronautics and Space Administration, Marshall Space Flight Center, AL 35812

8:00 AM

8:00 AM

Processing and Deploying the McDonnell Douglas Payload Assist Module (PAM)

C. E. Bryan, Electronic Systems Requirements, McDonnell Douglas Astronautics Company
I. J. Webster, Mission Integration/Launch, PAM Programs, McDonnell Douglas Astronautics Company

8:00 AM

8:00 AM

Space Transportation System Cargo Abort and Recovery Operations

Dwight J. Easterly, Staff Engineer
L. E. Henshaw, Senior Specialist Engineer, Boeing Aerospace Company

8:00 AM

8:00 AM

Spacelab Program Preparations for First Flight and Projected Utilization

James C. Harrington

8:00 AM

8:00 AM

STS Science and Applications Payloads: An Evolving Perspective

Michael J. Sander, NASA Headquarters, Washington, D.C.

8:00 AM

8:00 AM

Teleoperator Maneuvering System (TMS) Mission Applications and Benefits

David C. Cramblit, Chief, Space Systems Group, Marshall Space Flight Center, National Aeronautics and Space Administration
James R. Turner, TMS Study Manager, Marshall Space Flight Center, National Aeronautics and Space Administration

8:00 AM