Start Date

4-1984 8:00 AM

Description

The feasibility of performing an on-orbit refueling (OOR) operation to extend the orbital lifetime of the NASA Goddard Space Flight Center (GSFC) Gamma Ray Observatory (GRO) was investigated by TRW, the GRO mission contractor. This study shows that an OOR capability could be integrated into the GRO operational design early in the Phase D development with only minor cost impact and no schedule impact. In this approach, the GRO OOR design would be developed to achieve operational compatibility with the JSC/STS-developed Orbital Refueling System.

Comments

No other information or file available for this session.

Share

COinS
 
Apr 1st, 8:00 AM

Payload On-Orbit'Refueling Using the STS

The feasibility of performing an on-orbit refueling (OOR) operation to extend the orbital lifetime of the NASA Goddard Space Flight Center (GSFC) Gamma Ray Observatory (GRO) was investigated by TRW, the GRO mission contractor. This study shows that an OOR capability could be integrated into the GRO operational design early in the Phase D development with only minor cost impact and no schedule impact. In this approach, the GRO OOR design would be developed to achieve operational compatibility with the JSC/STS-developed Orbital Refueling System.

 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.