Start Date
4-1987 8:00 AM
Description
This presentation summarizes the module during the study phases B1 May 1987. evolution of a resource and B2 from July 1985 to May
The development has been performed by Dornier System on behalf of the European Space Agency ESA leading a consortium of 12 European companies. This summary shows the aim of establishing a design concept supposed to be most flexible with respeqt to changing mission scenarios as wel~ ~s different applications of the module. The presentation also shows the development of the design itself with emphasis on the present reference configuration.
1987.
Development of the Resource Module for the European Space Station Programme Columbus
This presentation summarizes the module during the study phases B1 May 1987. evolution of a resource and B2 from July 1985 to May
The development has been performed by Dornier System on behalf of the European Space Agency ESA leading a consortium of 12 European companies. This summary shows the aim of establishing a design concept supposed to be most flexible with respeqt to changing mission scenarios as wel~ ~s different applications of the module. The presentation also shows the development of the design itself with emphasis on the present reference configuration.
1987.
Comments
No other information or file available for this session.