Start Date
4-1988 8:00 AM
Description
This research used the Level 5 expert system software to develop a specialized knowledge system called the Launch Resource Scheduling system (LRS-II). LRS-II will be used as a decision aid by USSPACECOM to determine if there is sufficient launch capability to meet future satellite requirements and to quickly assess the impact of contingencies such as launch or on-orbit failures. LRS-II uses multiple knowledge bases to match satellite launch requirements to available launch vehicles, launch pads, and upper stages. Specialized knowledge about resources are stored in dBase III files, specific fields of the satellite record records to schedule the earliest launch requirement. During manifesting, the constraints of satellite and resource availability, site processing time, shuttle mission duration, and satellite on-orbit checkout time are used to insure the selected launch date is accurate.
LRS-II: A Specialized Knowledge System For Launch Resource Scheduling
This research used the Level 5 expert system software to develop a specialized knowledge system called the Launch Resource Scheduling system (LRS-II). LRS-II will be used as a decision aid by USSPACECOM to determine if there is sufficient launch capability to meet future satellite requirements and to quickly assess the impact of contingencies such as launch or on-orbit failures. LRS-II uses multiple knowledge bases to match satellite launch requirements to available launch vehicles, launch pads, and upper stages. Specialized knowledge about resources are stored in dBase III files, specific fields of the satellite record records to schedule the earliest launch requirement. During manifesting, the constraints of satellite and resource availability, site processing time, shuttle mission duration, and satellite on-orbit checkout time are used to insure the selected launch date is accurate.
Comments
No other information or file available for this session.