Description
Project Engineering is the Kennedy Space Center (KSC) organization responsible for monitoring the progress of milestone-closure as part of Space Shuttle processing, also known as a flow. An Operations Maintenance Plan (OMP) is a plan used to process a Space Shuttle as it is in a flow for a single mission. Each requirement-line-item in an OMP is known as an Operations and Maintenance Requirement Specification (OMRS). Each OMRS must be verified and closed separately by a configuration management person and an engineer. An Operations and Maintenance Instructions (OMI) document, which is a type of Work Authorization Document (WAD), consists of sequences of steps of tasks performed on a Space Shuttle used to satisfy a set of OMRS's. Performing steps in an OMI is a prerequisite for an OMRS to be verified and closed.
Paper Session II-A - Operations and Maintenance Requirements Specifications - Automated Buy-Off System
Radisson Resort at the Port, Convention Center, Salon I
Project Engineering is the Kennedy Space Center (KSC) organization responsible for monitoring the progress of milestone-closure as part of Space Shuttle processing, also known as a flow. An Operations Maintenance Plan (OMP) is a plan used to process a Space Shuttle as it is in a flow for a single mission. Each requirement-line-item in an OMP is known as an Operations and Maintenance Requirement Specification (OMRS). Each OMRS must be verified and closed separately by a configuration management person and an engineer. An Operations and Maintenance Instructions (OMI) document, which is a type of Work Authorization Document (WAD), consists of sequences of steps of tasks performed on a Space Shuttle used to satisfy a set of OMRS's. Performing steps in an OMI is a prerequisite for an OMRS to be verified and closed.