Subscribe to RSS Feed (Opens in New Window)
1988 | ||
Friday, April 1st | ||
8:00 AM |
Automated Analysis of Shuttle Wiring Using SCAN John Wilkinson, Lockheed Space Operations Co. 8:00 AM |
|
---|---|---|
8:00 AM |
Conceptual Model-Based Reasoning for Knowledge-Based Software Project Management Kent D. Bimson, Lockheed Software Technology Center 2100 East St. Elmo, Austin, Texas 78744 512/448-9719 8:00 AM |
|
8:00 AM |
Kent W. Machovec, Lockheed Software Technology Center, 96-01,30E 2100 East St. Elmo Road, Austin, Texas 78744-1016 512/448-9733 8:00 AM |
|
8:00 AM |
Information Systems For Shuttle Processing: An Enterprise Approach Mark W. Edson 8:00 AM |
|
8:00 AM |
KSC Base Operations Contractor Launch Readiness Assessment System W. D. Geaslen, Integrated Operations, EG&G Florida,Inc.,Kennedy Space Center,Florida 8:00 AM |
|
8:00 AM |
J. T. Wrbb, DIRECTOR LAUNCH CONTROL CENTER OPERATIONS LOCKHEED SPACE OPERATIONS COMPANY KENNEDY SPACE CENTER, FL 8:00 AM |
|
8:00 AM |
Real-Time Fault Management for Large-Scale Systems H. Biglari, Boeing Aerospace Company P.O. Box 1470 Huntsville, Alabama 35807 8:00 AM |
|
8:00 AM |
Rule-Based Configuration Control Mechanisms Brian G. Sayrs, Lockheed Software Technology Center, 96-01,30E 2100 East St. Elmo Road, Austin, Texas 78744 512/448-9751 8:00 AM |
|
8:00 AM |
Software Engineering Development Environment For The Launch Processing System Marcia W. Burch 8:00 AM |
|
8:00 AM |
Technology Advances for Space Shuttle Processing M. J. Wiskerchen, Stanford University 8:00 AM |
|
8:00 AM |
The Express Project: Automating the Software Development Process John W. McInroy 8:00 AM |
|
8:00 AM |
The Generic Checkout System Approach to Ground Checkout Systems Peter C. Simons, McDonnell Douglas Astronautics Co. 8:00 AM |