A background, timeline for Labor & Material up 10% to 110% Report. How much do you think KSC Construction Cost Escalations was for 2004 to 2006? And more importantly how much will it be for the Space Port Construction for 2007 thru 2015 for our $5 to $10 billion Moon Mars Facility Construction Program. This presentation will give some history as an aid to estimating the escalation for the Future Space Program Construction & GSE. It will also show a Cost Index Comparison to Engineering New Record (ENR) Construction Cost Index (CCI), and Building Cost Index (BCI) KSC Cost Index TR 1511 1974 to 2007, Nine other Cost Indexes, and Consumer Price Index, with Graphic Charts or History Comparison, and a JAB Computerized Cost Escalation Program for 1974 to 2020. Showing Current Projections and Worse Case Scenarios with potential impacts for more Hurricanes, Political, and Economical Impacts such as Oil, Gas, Environmental, Health & Property Insurance, and Building Codes. A Detailed Cost Engineering Cost Escalation Projection and Analysis for the ARES I, V, Orion Crew Capsule ($300 billion - Florida Today). With current examples of Cost Increases for Steel, Concrete, Copper, A Remember When Chart, and other reports of 8%, 10%, and 12% Escalation Projections.

Share

COinS
 
Apr 27th, 8:00 AM

Technical Paper Session I-A - Cost Escalation Alert for Requirements, Facilities & GSE for Moon & Mars Program

Cocoa Beach

A background, timeline for Labor & Material up 10% to 110% Report. How much do you think KSC Construction Cost Escalations was for 2004 to 2006? And more importantly how much will it be for the Space Port Construction for 2007 thru 2015 for our $5 to $10 billion Moon Mars Facility Construction Program. This presentation will give some history as an aid to estimating the escalation for the Future Space Program Construction & GSE. It will also show a Cost Index Comparison to Engineering New Record (ENR) Construction Cost Index (CCI), and Building Cost Index (BCI) KSC Cost Index TR 1511 1974 to 2007, Nine other Cost Indexes, and Consumer Price Index, with Graphic Charts or History Comparison, and a JAB Computerized Cost Escalation Program for 1974 to 2020. Showing Current Projections and Worse Case Scenarios with potential impacts for more Hurricanes, Political, and Economical Impacts such as Oil, Gas, Environmental, Health & Property Insurance, and Building Codes. A Detailed Cost Engineering Cost Escalation Projection and Analysis for the ARES I, V, Orion Crew Capsule ($300 billion - Florida Today). With current examples of Cost Increases for Steel, Concrete, Copper, A Remember When Chart, and other reports of 8%, 10%, and 12% Escalation Projections.

 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.