This study used an online survey to determine the necessity of using a structured management methodology for dealing with the aircraft life cycle costs, especially the end of leasing contract requirements and the aircraft's redelivery process. We reviewed the management methodologies found in the Project Management Institute Body of Knowledge (PMBoK) and the International Airline Transport Association (IATA) Aircraft Leasing Best Practices. Finally, we offered recommendations based on the experience and necessities identified via online surveys. Also, at the closure of this document, the authors of this study cited five recommendations as general guidelines that should be observed by all parties involved in an aircraft leasing contract to avoid unanticipated financial obligations and delays at its termination.
Este estudo se utilizou de uma plataforma on-line de pesquisa para determinar a necessidade de utilização de uma metodologia de gestão para lidar com as necessidades decorrentes de um contrato de arrendamento de aeronaves, em especial, os temas do término de contrato e o processo de retorno de aeronaves arrendadas. Revisou-se as metodologias de gestão encontradas no Project Management Body of Knowledge (PMBoK) e a metodologia proposta pela Associação Internacional de Transportadoras Aéreas (IATA – em inglês). Finalmente, propôs-se recomendações, baseadas em requisitos e nas experiências identificadas através da pesquisa on-line, de metodologias de gestão que melhor respondem a estas necessidades. Em adendo, ao final deste documento, os autores deste estudo citam cinco recomendações generais que devem ser observadas por todas as partes envolvidas num contrato de arrendamento de aeronaves para que sejam evitados atrasos e obrigações fiscais não-antecipadas ao final do mesmo.
Publisher
Embry-Riddle Aeronautical University
City
Sao Paulo, Brazil
Scholarly Commons Citation
Ferreira, D., Horninck, D., & Sant'Ana, F. (2020). Aircraft Leasing and Life Cycle Cost Management - Road Map for Closing the Gap Between Strategy and Results. , (). Retrieved from https://commons.erau.edu/brazil-graduate-works/5
Additional Information
This Capstone Project was prepared and approved under the direction of the Group's Capstone Project Chair, Dr. Leila Halawi It was submitted to Embry-Riddle Aeronautical University in partial fulfillment of the requirements for the Aviation Management Certificate Program.